ZKTeco ZKAccess 3.5 Migration to ZKBio CVAccess Dubai

Access Control Software Migration

ZKTeco ZKAccess 3.5 Migration to ZKBio CVAccess in Dubai, UAE

A planned transition from discontinued ZKAccess 3.5 to ZKTeco’s current web-based ZKBio CVAccess platform for compatible access-control and attendance environments.

FourTeck helps business and technical teams assess existing controllers, terminals, personnel data, access levels, communication settings, licensing, server readiness, and cutover risks before a live migration. The goal is not simply to install new software, but to move the operating environment in a controlled way while identifying anything that must be rebuilt, reconnected, re-enrolled, or tested.

Legacy System Review
Hardware Compatibility Check
Cutover Validation

Request Quote
Review Migration Scope

ZKTeco ZKBio CVAccess web-based access control software dashboard
Verified ZKTeco ZKBio CVAccess product image. Final interface and available functions depend on the deployed software version and enabled modules.
Quick product information

Migration Procurement Snapshot

This is an assessment-led software migration service, not a boxed upgrade with identical results for every customer. Compatibility and transfer scope depend on the existing ZKTeco hardware, firmware, data quality, license needs, and operating procedures.

Brand
ZKTeco
Service type
Legacy access-control software migration
Current target release
ZKBio CVAccess 4.4.1 x64 listed by ZKTeco in August 2026
Suitable for
Small-to-medium ZKTeco security environments
Compatibility
Device and firmware dependent
Commercial scope
Configuration dependent; quote after review
Product overview

What This Migration Is Designed to Solve

ZKAccess 3.5 is a legacy platform that ZKTeco has discontinued, while ZKBio CVAccess is the vendor’s active lightweight web-based security platform for personnel, access control, attendance, smart video surveillance, and system management. For businesses still operating ZKAccess 3.5, the practical question is therefore how to move safely without disrupting doors, user permissions, attendance workflows, or daily administration.

A migration begins with understanding the present installation. That means identifying controllers and terminals, recording firmware versions, documenting communication keys and IP addressing, reviewing personnel and card records, mapping access levels and schedules, checking attendance requirements, and confirming which functions are genuinely used today. Legacy systems often contain years of accumulated rules and user records, so moving to a new platform should not be treated as a simple installer replacement. Some environments may allow substantial reuse of existing data and hardware; others may require manual recreation of selected rules, firmware preparation, or biometric re-enrolment.

ZKBio CVAccess is positioned by ZKTeco for small-to-medium organizations and is designed to support most ZKTeco hardware. That broad statement is useful, but it does not remove the need for model-level verification. A controller that communicates correctly with ZKAccess 3.5 may use a different communication method, firmware branch, or feature set when connected to a newer platform. FourTeck therefore treats compatibility confirmation as an early project step rather than an assumption made after installation.

For a UAE buyer, the value of a managed transition is clarity: what can be retained, what must change, how the cutover should be staged, which licenses or server resources are required, what downtime is realistic, and how success will be tested. FourTeck can help turn a legacy environment into a practical migration plan that procurement, IT, facilities, HR, and security teams can understand before the change window begins.

Business benefits

Why Businesses Plan the Move Instead of Waiting

The strongest benefit is reducing dependence on discontinued management software while creating a clearer path for supported ZKTeco operations. The migration also creates an opportunity to clean up device records, permissions, and administration practices.

01 / Lifecycle

Move away from discontinued ZKAccess 3.5

ZKTeco’s own support information states that ZKAccess 3.5 is discontinued and recommends considering ZKBio CVAccess. Migrating before a critical failure or urgent hardware replacement gives the business more control over testing, downtime, and user communication. A planned change is easier to document and validate than a rushed replacement caused by an unsupported software problem.

02 / Browser workflow

Adopt a web-based management platform

ZKBio CVAccess is described by ZKTeco as a lightweight web-based security platform. For administrators, that changes how the system is accessed and managed compared with an older desktop application. The exact deployment method, server design, and permissions still need to be reviewed, but a browser-oriented platform can support more structured administration within the business network.

03 / Consolidation

Bring related security functions into one target environment

The target platform includes personnel management, access control, time and attendance, smart video surveillance, and system management functions. Buyers should confirm which modules and licenses are relevant to the existing site rather than enabling features only because they exist. The benefit is a clearer management model aligned with actual operational needs.

04 / Clean-up

Use migration as a data and permission review

Long-running access systems commonly accumulate inactive users, outdated access levels, old departments, and schedules that nobody remembers. A controlled migration gives the customer a reason to review what should actually move. This can reduce confusion in the new platform and make future administration easier for security and HR teams.

05 / Validation

Test doors and permissions before sign-off

A migration should end with more than a successful login screen. Door control, user rights, schedules, event monitoring, attendance data where required, and device communication need to be tested against an agreed checklist. This helps the buyer confirm that the operational outcome matches the project scope.

06 / Procurement

Understand cost drivers before approving the project

The final cost can depend on device count, data volume, module requirements, licensing, server work, remote or onsite activity, testing effort, and whether legacy hardware needs replacement. A scoped quote gives procurement a clearer basis for approval than a generic software price that ignores implementation work.

Product highlights

Verified Target Platform Strengths

ZKBio CVAccess is not presented by ZKTeco as a single-purpose door program. It is a web-based security platform intended for small-to-medium business management and designed to support most ZKTeco hardware. Its available management areas include personnel, access control, time and attendance, smart video surveillance, and system management.

The official ZKTeco download page currently lists a 64-bit ZKBio CVAccess 4.4.1 release package dated August 2026, together with a current user manual, release notes, change log, datasheet, and hardware suggestion list. This matters to migration planning because buyers should design around a current supported target, not an old installer stored on a technician’s laptop.

Lifecycle signalZKAccess 3.5 is discontinued; ZKTeco recommends considering ZKBio CVAccess.
Management modelLightweight web-based security administration rather than legacy desktop-only workflow.
Compatibility noteDesigned to support most ZKTeco hardware, but the exact model and firmware still need project-level confirmation.
Migration realityData, access rules, attendance settings, and biometrics should be assessed individually; no blanket automatic-transfer claim is assumed.
Technical specification

Migration and Platform Specification Guide

The table separates confirmed vendor facts from project-dependent migration items. Where the exact result depends on the existing installation, FourTeck confirms it during assessment instead of treating it as a fixed specification.

Item Confirmed / Planned Detail Buyer Note
Brand ZKTeco Existing hardware should be identified by exact model and firmware.
Legacy platform ZKAccess 3.5 ZKTeco states this platform is discontinued.
Target platform ZKBio CVAccess Current build and module choice should be agreed before implementation.
Platform type Lightweight web-based security platform Server, browser, network, and access requirements are configuration dependent.
Vendor-listed management areas Personnel Management, Access Control, Time & Attendance, Smart Video Surveillance, System Management Enabled functions and licensing depend on the selected deployment.
Current official software listing ZKBio CVAccess 4.4.1_R_x64_2026-07-21-1509, posted 14 August 2026 Final deployed build should follow current vendor guidance at project time.
Hardware support Designed by ZKTeco to support most ZKTeco hardware Exact controller or terminal compatibility must be verified.
Personnel transfer Configuration dependent Source data quality and supported import method affect the result.
Access levels and schedules Configuration dependent Complex rules may need review or recreation before cutover.
Biometric data Device and template-format dependent Re-enrolment may be required for some devices or generations.
Licensing Based on selected model, modules, and deployment scope Confirm license requirements before final quote.
Server / infrastructure Configuration dependent Size according to current vendor guidance and project scale.
Warranty / support Contact FourTeck for current options Coverage depends on license, product terms, and project scope.

How to read this specification table

A migration project contains both product facts and environment-specific decisions. The vendor can confirm what the target platform is designed to do, but the customer’s hardware list determines whether each controller or terminal can move cleanly. The same principle applies to data. Personnel records may be straightforward to export and import, while custom access rules, holiday schedules, special anti-passback logic, attendance settings, or biometric templates may need additional handling. Buyers should therefore avoid approving a project only from the target software name. A useful quotation should include device inventory, firmware versions, approximate user count, door count, attendance requirements, current server details, any remote sites, required downtime window, and the functions that must work on day one. FourTeck can use that information to separate simple transfer tasks from compatibility work and testing effort.

Configuration and buyer guidance

Five Questions to Answer Before Scheduling the Cutover

The highest-risk mistake is beginning installation before confirming the exact legacy device inventory. Hardware model, firmware, communication method, and business-critical rules should be documented before the target server is treated as production-ready.

01 / CONFIRM

Which devices must remain in service?

List every controller, standalone terminal, reader-connected panel, and remote site. Include model, firmware, IP address, communication key or relevant connection information. This determines what can be reused and what may require firmware preparation or replacement.

02 / CHECK

Which data has business value?

Decide whether the project needs active personnel only, historical records, card details, departments, access levels, schedules, attendance information, photos, or other data. Migrating unnecessary legacy records can make the new platform harder to manage.

03 / PLAN

What must work immediately after cutover?

Identify critical doors, high-security areas, employee schedules, reporting, visitor processes, and attendance workflows. These become the acceptance checklist. A migration is successful only when the agreed business functions operate correctly, not merely when devices appear online.

04 / MATCH

What target modules and licenses are required?

ZKBio CVAccess includes several management areas, but the customer may only need a subset. Match the required functions to the number of doors, devices, users, attendance points, or other licensed elements so the commercial scope reflects the real environment.

05 / REVIEW

What is the acceptable change window?

Factories, offices, warehouses, schools, and clinics have different tolerance for access-control interruption. Define the maintenance window, rollback approach, test users, responsible approvers, and any requirement to keep the old system available during validation.

For a useful quote, send FourTeck the existing ZKAccess 3.5 version information, device list with firmware where available, number of users and doors, required modules, server or VM preference, site location, desired change date, and any unusual rule such as anti-passback, multiple shifts, restricted areas, or remote branches. This allows the migration scope to be built around evidence rather than assumptions.

Ideal business use cases

Where This Migration Makes Practical Sense

The service is most relevant where ZKAccess 3.5 is still part of daily operations and the organization wants a controlled path to a current ZKTeco platform without losing sight of legacy hardware and workflow dependencies.

Primary use case

Established office or headquarters access system

A business may have years of employee records, card assignments, door schedules, and access levels built in ZKAccess 3.5. The migration is useful when the company wants to retain compatible controllers while moving administration to ZKBio CVAccess. The project should focus on user cleanup, permission mapping, compatibility verification, and an acceptance test covering reception, staff entrances, server rooms, management areas, and any doors with special time schedules.

Warehouse and logistics site

Warehouses often rely on controlled staff doors, restricted stores, loading areas, and shift-based access. Migration planning should include after-hours rules, guards, contractor permissions, and any attendance process used by operations. A change window can be aligned with lower-activity periods to reduce disruption.

School, training center, or campus office

Education environments can have staff, administration, service personnel, and restricted technical rooms with different access schedules. Before migration, the buyer should confirm which people and time zones remain active and whether attendance reporting or visitor processes must be maintained in the target platform.

Clinic or healthcare administration site

Clinical facilities may depend on restricted rooms, staff-only areas, pharmacy or records access, and extended operating hours. The migration plan should prioritize continuity and clear testing. High-risk doors should be identified before work starts so they can be validated immediately after cutover.

Multi-department small-to-medium business

Where HR, security, facilities, and IT all interact with the access system, moving platforms is also an opportunity to define ownership. HR may maintain active personnel, security may own access policy, IT may manage the server and network, while facilities validates doors and readers. Clear roles reduce confusion after the new platform goes live.

Legacy site adding newer ZKTeco devices

A company may discover that the old software has become a constraint when adding current hardware. If ZKBio CVAccess is the chosen target, the project should compare old and new device compatibility, communication methods, credential types, and licensing before the customer commits to a mixed-generation environment.

Feature deep dive 1

ZKAccess 3.5 to ZKBio CVAccess — Compatibility Mapping

Compatibility should be proven by model and firmware, not assumed from the ZKTeco logo. ZKBio CVAccess is designed to support most ZKTeco hardware, but a legacy estate can include multiple hardware generations, communication modes, credential types, and firmware branches.

FourTeck’s migration planning can start with a device register that records each controller or terminal, its location, firmware, network details, current role, and whether it controls one door or several. This register becomes the basis for deciding what can remain, what needs preparation, and what should be replaced rather than carried forward. It also helps procurement understand whether the project is mostly software work or whether hardware cost must be included.

Buyer outcomes from a compatibility review

  • A confirmed list of devices expected to remain in service.
  • Identification of firmware or communication items that need attention.
  • Early visibility of hardware that may not suit the target design.
  • A clearer estimate of device reconnection and validation effort.
  • Fewer surprises during the actual change window.

This stage is especially important when the legacy environment includes standalone terminals or older biometric devices. Reusing hardware can be cost-effective when compatibility is confirmed, but forcing incompatible devices into a new management platform can create more support work than replacing them deliberately.

Feature deep dive 2

ZKBio CVAccess Web-Based Management and Operational Fit

ZKBio CVAccess changes the administration model as well as the software version. ZKTeco positions it as a lightweight web-based platform with personnel, access control, attendance, smart video surveillance, and system management functions. The migration should therefore consider who will use the system, which modules they need, and how administrative access will be controlled inside the customer’s network.

PERSONNEL

Plan who maintains user records, departments, cards, and employee status after cutover. Data ownership should be clear between HR and security teams.

ACCESS CONTROL

Review doors, time zones, access levels, emergency requirements, and special rules so permissions in the target platform reflect actual business policy.

ATTENDANCE

If attendance is business-critical, include report and punch validation in the acceptance plan rather than assuming access events alone prove attendance functionality.

ADMINISTRATION

Define administrator roles, password handling, backup responsibilities, update ownership, and who can make changes after go-live.

A good migration does not enable every available function by default. It maps the customer’s present requirements to the target platform and leaves a clear path for future expansion. This keeps the first cutover manageable while still moving the organization to a current ZKTeco management platform.

Feature deep dive 3

Migration Validation, Rollback Thinking, and Operational Continuity

The project should be judged by operational outcomes, not by whether the new server is running. Door actions, user permissions, time schedules, device communication, event visibility, attendance functions where required, and administrator access all need to be checked against a pre-agreed test plan.

Before cutover

Back up available legacy data, document the current system, identify critical doors, prepare test users, and agree who has authority to approve the new platform for production use.

During cutover

Reconnect or onboard devices in a controlled sequence, verify communication, apply agreed access rules, test selected users, and record exceptions instead of improvising permanent workarounds.

After cutover

Validate normal and restricted access, review event monitoring, confirm attendance or reporting where in scope, train administrators, and retain project notes for future support.

For larger or sensitive sites, the buyer may choose a phased approach rather than changing every device in one window. The right method depends on how the legacy software and controllers behave, whether parallel testing is practical, and how much downtime the business can accept. FourTeck can help define a validation sequence that fits the environment rather than applying one universal cutover method.

Buyer decision guide

What Buyers Should Check Before Purchase

Do not purchase migration work on the assumption that every ZKAccess 3.5 database, biometric template, and controller can move unchanged. The most reliable buying decision comes from an inventory-led review that separates confirmed compatibility from items that require testing, recreation, or replacement.

01 / FIT

Configuration Fit

Confirm the number of doors, controllers, terminals, users, departments, schedules, attendance points, and management functions. A small office with a few doors needs a different migration effort from a multi-site business with years of records and complex access rules.

02 / MATCH

Compatibility Check

Provide model and firmware information for every legacy device. Also note communication keys, network segments, remote sites, readers, credential types, and any special integration. This identifies where reuse is realistic and where a hardware or firmware decision may be needed.

03 / TERMS

Availability, License, and Support Expectations

Confirm the target software build, required modules, licensing method, server responsibility, implementation scope, and expected post-migration assistance. Availability, commercial terms, and support coverage can vary, so they should be written into the quotation rather than assumed.

04 / REQUEST

Quote Preparation

Send the current software version, database or backup information where available, device list, user count, door count, locations, required date, maintenance window, desired target functions, and any attendance or reporting requirement. The more complete the input, the more useful the migration quotation.

What if the buyer only knows the software name?

FourTeck can start with a discovery checklist. Screenshots of the existing device list, controller models, software version, approximate employee count, and a description of the critical doors can be enough to begin. The first objective is to convert an uncertain legacy environment into a documented scope. That protects the customer from buying a generic migration service that does not match the real installation.

UAE availability and service support

Migration Planning and Quote Support in Dubai and the UAE

FourTeck supports inquiries for ZKTeco ZKAccess 3.5 Migration to ZKBio CVAccess Dubai with assistance for scope discovery, hardware compatibility review, target configuration discussion, implementation planning, and quotation. Service availability depends on the customer environment, project size, licensing requirements, site access, technical complexity, and scheduling. No assumption is made that every legacy installation can be migrated using the same process.

Selection support

Review whether ZKBio CVAccess is the right target for the customer’s device count, management needs, and expected growth.

Deployment coordination

Plan server readiness, device onboarding, change windows, testing, and any required accessories or replacement hardware.

Warranty and support guidance

Clarify the support scope attached to software, hardware, or implementation items in the quotation. Coverage depends on the selected products and project terms.

The target ZKBio CVAccess software is actively listed by ZKTeco with current 2026 downloads and documentation. FourTeck can help customers align that current vendor platform with the realities of an older ZKAccess 3.5 installation. For projects that require onsite work, remote planning, hardware replacement, or a staged migration, the exact service method is confirmed during scoping.

Contact FourTeck Sales

UAE city coverage

Dubai, Abu Dhabi, Sharjah, and Ajman Project Support

Businesses in Dubai, Abu Dhabi, Sharjah, Ajman, and other UAE locations can contact FourTeck for migration assessment, compatibility guidance, and quotation support. A customer may have one head-office server controlling a small number of doors, or several sites with different generations of ZKTeco hardware. The location itself does not determine the migration method; the system architecture and device inventory do.

For multi-site customers, FourTeck can help organize the requirement by site so procurement understands which locations are straightforward and which require extra testing. The project plan can also identify local site contacts, maintenance windows, network access requirements, and approval steps. This is useful when security, facilities, and IT responsibility is divided between different offices.

Regional inquiry support

GCC and Africa Migration Enquiries

FourTeck also supports business technology inquiries across selected GCC and Africa markets through regional platforms and inquiry channels. Organizations with sites in Saudi Arabia, Qatar, Oman, Kuwait, Bahrain, Kenya, Uganda, or other Africa region locations may need a common migration standard while still working with different local networks, device generations, and support arrangements.

For regional projects, the most useful starting point is a site-by-site device inventory and a clear statement of which functions are centralized. Availability, delivery, warranty handling, software licensing, remote assistance, and onsite services can vary by country and project scope. FourTeck can help coordinate the inquiry so that each location is reviewed against the same technical checklist without claiming that every country has identical stock or service coverage.

Regional buyers can also use FourTeck’s Kenya business technology platform, Uganda inquiry platform, Africa regional technology portal, and Kuwait business technology platform where relevant to their procurement process.

Related solutions

Other Options Buyers May Consider

The right alternative depends on whether the buyer needs a broader security platform, mobile administration, compatible field hardware, or supporting network infrastructure. These options should be reviewed as part of the same migration conversation rather than purchased in isolation.

Broader platform alternative

ZKTeco ZKBio CVSecurity

ZKBio CVSecurity appears as a related ZKTeco product to CVAccess and may be worth discussing when the customer’s requirements are larger or more complex than the lightweight CVAccess positioning. FourTeck can help compare the project requirement before the buyer selects the target platform.

Request a platform suitability review

Mobile companion

ZKBio Zexus Mobile App

ZKTeco lists ZKBio Zexus as a mobile application related to ZKBio CVAccess. Buyers considering mobile operational features should confirm app compatibility, user roles, network exposure, and supported functions for their exact deployment.

Review the official ZKTeco mobile app

Compatible terminal example

ZKTeco F18

ZKTeco’s current F18 product information lists AC Push firmware with ZKBio CVAccess support, illustrating why firmware and device mode matter during migration. Existing F18 units should still be checked individually before reuse.

Check the official F18 product page

Solution category

FourTeck CCTV and Access Control Systems

If the migration exposes outdated controllers, readers, cameras, or door equipment, buyers can review the wider access-control solution category and plan software and field hardware as one project.

Explore access control solutions in UAE

Network accessory

Managed PoE Switching for Security Devices

Newer access terminals, cameras, or supporting devices may depend on reliable Ethernet and PoE infrastructure. A network review can be added when the access-control migration also includes cabling or switch changes.

Review PoE switch options

Why buyers choose FourTeck

A Migration Conversation That Starts With the Existing Environment

For a legacy access-control project, product sourcing alone is not enough. The buyer needs someone to ask what is installed today, which functions are essential, which devices are expected to remain, and what the business considers a successful cutover. FourTeck’s role can include pre-sales discovery, configuration guidance, quote preparation, related hardware matching, delivery coordination, and warranty guidance for the items included in the project.

01. Legacy inventory review

Turn device lists, screenshots, firmware details, and current workflows into a structured project starting point.

02. Configuration guidance

Match the target platform and modules to door count, user count, attendance needs, management roles, and expected growth.

03. Compatibility-focused scoping

Identify device and firmware questions before they become cutover problems.

04. Quote assistance

Build the commercial request around actual implementation effort, licensing, replacement items, and service scope.

05. UAE delivery coordination

Coordinate required software, compatible accessories, or replacement hardware according to supplier status and project schedule.

06. Warranty guidance

Clarify applicable warranty or support terms for quoted products without assuming coverage that has not been confirmed.

Buyers can also review FourTeck’s broader CCTV and access-control solutions, browse FourTeck UAE business technology offerings, or send the current legacy system details through the FourTeck contact page.

Frequently asked questions

ZKAccess 3.5 to ZKBio CVAccess Migration FAQ

01

Why should we consider moving away from ZKAccess 3.5?

ZKTeco states that ZKAccess 3.5 has been discontinued and recommends considering ZKBio CVAccess instead. A planned migration allows the business to review hardware compatibility, clean up user data, define the required target functions, and test the new environment before an unsupported legacy issue forces an urgent change.

02

Can every ZKAccess 3.5 device connect to ZKBio CVAccess?

No blanket compatibility claim should be made. ZKTeco says ZKBio CVAccess is designed to support most ZKTeco hardware, but the actual result depends on the exact controller or terminal model, firmware, communication mode, and feature requirements. FourTeck can review a device inventory before migration planning is finalized.

03

Will all personnel and access rules move automatically?

Not necessarily. Personnel records may be transferable through supported export and import methods, while complex access levels, schedules, historical data, or special rules may need additional handling. The safest approach is to identify exactly which data must be retained, test the transfer method, and manually rebuild items that cannot be moved reliably.

04

What happens to fingerprints or face templates?

Biometric reuse is device and template-format dependent. Some environments may allow reuse through supported device synchronization or migration methods, while others may require re-enrolment. Buyers should not assume biometric data will move simply because the user record transfers. Testing a representative group before full cutover is advisable.

05

What information should we send for a quotation?

Send the current ZKAccess version, device list, firmware details where available, number of doors and users, required attendance functions, site count, server preference, desired migration date, maintenance window, and any special access rules. A database backup or screenshots of the current configuration may also help during technical assessment.

06

Is ZKBio CVAccess still a current ZKTeco product?

Yes. ZKTeco’s official product page currently lists ZKBio CVAccess and shows recent 2026 software, user-manual, release-note, change-log, and hardware-suggestion-list downloads. The exact build deployed for a customer should still be confirmed at project time because software releases can change.

07

Can we keep using our existing server?

Possibly, but server suitability is configuration dependent. The target software version, user and device scale, operating environment, database needs, backup plan, security policy, and customer IT standards should all be reviewed. FourTeck can include server-readiness discussion in the migration scope instead of assuming the legacy host is suitable.

08

How much downtime should we expect?

Downtime depends on the number of devices, data-transfer method, network access, compatibility findings, testing scope, and whether the migration is performed in one stage or phases. The project should define a maintenance window and acceptance checklist before work begins. Critical sites may benefit from staged testing or a documented rollback plan.

09

Can FourTeck help if some legacy devices are not suitable?

Yes, FourTeck can help review alternative ZKTeco hardware or related access-control options when the migration assessment finds equipment that is no longer practical for the target platform. Any replacement recommendation should be based on the door function, credential type, network, power, reader interface, and business requirement rather than model name alone.

10

How do we request migration support in the UAE?

Contact FourTeck with the legacy software details, device inventory, approximate user and door count, required target functions, site location, preferred schedule, and any installation or training requirement. FourTeck can review the information and prepare a scope and quotation based on current software, licensing, hardware compatibility, and service availability.

Buying assistance

Plan the Migration Around Your Actual ZKAccess Environment

FourTeck can review the source software, controller and terminal inventory, user count, access rules, attendance requirements, target modules, server readiness, change window, delivery location, and support expectations before preparing a migration quotation.

Share these details: current ZKAccess version, device models and firmware, number of doors and users, required target functions, site count, desired date, and any special access or attendance rules.

Request Buying Assistance

Need help migrating?
Get Quote

Scroll to Top